Waterfront Toronto report pegs Port Lands project costWaterfront Toronto has released an extensive due diligence report on the proposed Port Lands Flood Protection Project that revises the estimated cost by $50 million with a total cost of at $1.25 billion. The proposed project aims to naturalize the mouth of the Don River, provide flood protection to the area and unlock economic development potential.